Laying Gas Pipeline Using Open Cut And Hdd Method Of (1) Bankura Saltora Road From Ch.2.287Km To Ch. 2.300Km -13.0M, Ch.2.516Km To Ch.11.900Km -9.384 Km, Ch.14.340Km To Ch.19.340Km -05.00 Km And Ch. 19.440Km To Ch. 31.750Km -12.31Km, Total Length 26.707Km (Steel Pipeline), And Also From Ch. 2.287Km To Ch. 2.300Km -13.0M, And Ch.2.516Km To 5.287Km -2.771Km Of Bankura Saltora Road, Total Length-2.784 Km Mdpe Pipe Laying Along The Same Alignment Of Steel Pipeline Under Bankura Highway Division In The District Of Bankura.